Alexander House
Monday, 30 June 2014
The Bathroom...
has all the pipework installed now:
and down below in the study a false ceiling is installed to hide the outlet pipes. (The alternative was to take them around the outside of the house, and I didn't want that.)
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment